Installation includes underground facilities from the meter base to the PUD access point.
The State of Washington, Department of Labor and Industries, must inspect and approve the installation before Pacific County PUD connects the service. Customers will need to notify the PUD when they have passed their L&I inspection.
It's important to research and comply with local requirements before commencing your project.
For guidance on wiring code requirements, you can reach out to the Washington State Department of Labor and Industries or seek assistance from a qualified electrician.
The Installation Process, Safety, & District Policies
Consider that engineering, permitting, and scheduling requirements need time before constructing a new electrical service.
Timely submission of applications and adherence to
District-set requirements are vital prerequisites.
Safety is a top priority; make sure all customer-owned equipment and wiring meet National Electric Code (NEC) and state or local requirements to protect your safety and that of Pacific County PUD employees.
Accepting service from the District is an agreement with and acceptance of the District's policies, making it a crucial step in the process.
Requirements and specifications for installing residential electric service where it has not existed before can be found in the Public Utility District 2 of Pacific County (PDF) document. All new and revised services must be installed underground.
New Service Example: Where electric service has been off for over 1 year or never existed at all. This includes the addition of another meter to a site with existing electric service.
Revised Service Example: A current active service or a service that has not been off for 1 year or more where the customer wishes relocate and/or convert the service from overhead to underground or increase the service size (ex. 200amp to 400amp).